All checks Housing Provisions 6.2.1
Subfloor ventilation check
Subfloor vents have to add up to 2,000, 4,000 or 6,000 mm² for each metre of wall, depending on the climatic zone, with at least 150 mm of clearance under the bearers. Pick your zone, enter the wall and its vents, and see if there is enough opening.
- Clause
- 6.2.1
- Code
- NCC 2022
- Drawn in
- mm
Checks
Pass. 3 of 3 checks within limits.
Vent openings: Within the limit.
6,400 mm² a metre
6,000 mm² a metre or more6.2.1(1)
First vent from the corner: Within the limit.
450 mm
600 mm or less6.2.1(2)
Ground clearance: Within the limit.
400 mm
400 mm or more6.2.1(1)
Vents this wall needs: For information.
8
at 8,000 mm² eachTable 6.2.1a
Spacing: For information.
Even
no dead air spaces6.2.1(2)
This checks the deemed-to-satisfy dimensions for houses (Class 1 and Class 10 buildings) in NCC 2022. State variations and your approved plans come first, and your certifier has the final say.
What the code asks for
- Vent openings add up to at least 2,000 mm² for each metre of wall in Zone A, 4,000 mm² in Zone B and 6,000 mm² in Zone C. Table 6.2.1a
- Those figures halve where the ground under the floor is sealed with an impervious membrane. Table 6.2.1a
- Openings are spaced as evenly as practicable, with one no more than 600 mm in from each corner, and no dead air spaces. 6.2.1(2)
- Internal subfloor walls have openings with the same clear area as the external wall openings beside them. 6.2.1(4)
- In a double leaf masonry wall the openings go through both leaves and line up. 6.2.1(3)
- The ground is at least 150 mm below the lowest bearer or joist, or 400 mm where a termite system has to be inspected. Table 6.2.1b
- On a sloping site the 400 mm can reduce to 150 mm within 2 m of the external walls. Table 6.2.1b
- Very damp or flood-prone ground needs 50% more ventilation, or a membrane over the ground, or durable timber or steel framing. 6.2.1(5)
- The space is cleared of building debris and plants, and the ground under the floor is graded to drain. 6.2.1(2)
Source: Part 6.2 of the ABCB Housing Provisions (NCC 2022). The vent areas and the ground clearances are the same in NCC 2025.
Questions people ask
How many subfloor vents do I need?
Multiply the wall length by the figure for your zone, then divide by the opening of one vent and round up. A 10 m wall in Zone C needs 60,000 mm². With vents that have 8,000 mm² of opening each, that is 8 vents.
Which climatic zone am I in?
The code maps three zones by relative humidity in the most humid season. Zone A is under 60% at 9 am. Zone B is over 60% at 9 am and over 40% at 3 pm. Zone C is over 70% at 9 am and over 60% at 3 pm. Find your area on the map in Part 6.2 of the Housing Provisions.
Does a membrane on the ground halve the vents?
Yes. Where the ground under the floor is sealed with an impervious membrane, the opening needed for each metre of wall is half the bare ground figure.
How much clearance does a timber floor need above the ground?
At least 150 mm from the ground to the underside of the lowest bearer or joist. Where a termite management system under the floor has to be inspected, it is 400 mm, which on a sloping site can reduce to 150 mm within 2 m of the external walls.